TSH GROUPED BIOGAS RECOVERY PROJECT

TSH Resources Berhad · PAI1: East Kota Waringin · — ha

Pipeline

A grouped CDM activity bundling POME methane recovery and biogas-to-power across TSH Resources' palm oil mills in Sabah and Indonesian Kalimantan.

Name
TSH GROUPED BIOGAS RECOVERY PROJECT
Developer
TSH Resources Berhad
Province
PAI1: East Kota Waringin
Type
Waste handling and disposal
Methodology
AMS-I.D.,AMS-I.F.,AMS-III.H.
Status
Pipeline
Integrity score
63 / 100
Registry IDs
Verra VCS4467
Generated
Updated 2026-04-23

What is TSH GROUPED BIOGAS RECOVERY PROJECT?

A grouped CDM activity bundling POME methane recovery and biogas-to-power across TSH Resources' palm oil mills in Sabah and Indonesian Kalimantan. The KLSE-listed developer stacks AMS-I.

Who operates TSH GROUPED BIOGAS RECOVERY PROJECT?

TSH GROUPED BIOGAS RECOVERY PROJECT is developed by TSH Resources Berhad and listed on Verra VCS4467.

What is its integrity score?

63 / 100. Driven down by validation recency (50) and supported by community flags (75).

Why is it notable?

Latest news. No dated project-specific news located in this pass; TSH Resources' FY2025 results release (April 2026) reiterates renewable-energy and biogas operations at group level but does not publicly update the grouped CDM activity's registration or crediting status.

When was this last updated?

This dossier was generated on 2026-04-23 by claude-agent-websearch.

A grouped CDM activity bundling POME methane recovery and biogas-to-power across TSH Resources' palm oil mills in Sabah and Indonesian Kalimantan. The KLSE-listed developer stacks AMS-I.D, AMS-I.F and AMS-III.H methodologies to cover grid electricity, on-site thermal use and wastewater methane avoidance. TSH's Tawau bio-complex runs a 12 MW biomass co-generation plant plus a 3 MW biogas engine; all group renewable-energy projects are CDM-registered per TSH disclosures.

Activities & scale The activity is a grouped programme capturing methane from palm oil mill effluent (POME) anaerobic lagoons and routing the biogas to engines and boilers at multiple TSH mills 1. TSH's own disclosures describe a 12 MW biomass co-generation plant plus a 3 MW biogas engine at its Tawau bio-complex, with biogas plants commissioned across all Sabah mills; the 2005 Kunak complex was the first biomass plant in Malaysia connected to the national grid under a REPPA.

5 more paragraphs plus 3 sources — sign in to read the full analysis.

Sign in with Google

AI-generated from public sources on 2026-04-23 · confidence: medium · model: claude-agent-websearch · Flag inaccuracy

63/ 100

Moderate

Validation & verification50/100
Reversal risk (inverse)70/100
Community & benefit-sharing75/100
Transparency & disclosure55/100

v1 methodology, calibrating. Last computed 2026-06-10.

RegistryExternal IDStatusLast synced
VerraVCS4467pipeline08 Jun 2026· Synced 2 days ago

Pipeline — no issuances recorded.

Total retired

No retirements recorded.

Total

3.123

High confidence

0

Nominal confidence

0

View all alerts for this project →

Score computed 2026-06-10 from inputs: alerts last 90 days (3123), high-confidence alerts (0), registries (1), years since validation (unknown).

Methodology v1. Weights: validation recency 25%, reversal risk 35%, community flags 20%, transparency 20%. See full methodology →