RePL Recycling is a pipeline CDM project in Banten, Indonesia, developed by South Korea's H201 Co., Ltd under small-scale methodology AMS-III.AJ. H201 is best known for running the RePL plastic-credit program, which has separately registered a Verra PWR project with Inocycle covering 84,000 t of recycled plastic (Jun 2025) — reportedly the largest plastic-credit issuance globally to date.
- Name
- RePL Recycling plastic project
- Developer
- H201 Co., Ltd
- Province
- Banten
- Type
- Waste handling and disposal
- Methodology
- AMS-III.AJ.
- Status
- Suspended
- Integrity score
- 63 / 100
- Registry IDs
- Verra VCS4445
- Generated
- Updated 2026-04-23
What is RePL Recycling plastic project?
RePL Recycling is a pipeline CDM project in Banten, Indonesia, developed by South Korea's H201 Co., Ltd under small-scale methodology AMS-III.
Who operates RePL Recycling plastic project?
RePL Recycling plastic project is developed by H201 Co., Ltd and listed on Verra VCS4445.
What is its integrity score?
63 / 100. Driven down by validation recency (50) and supported by community flags (75).
Why is it notable?
Latest news. 25 Jun 2025: RePL and Inocycle Technology Group announced issuance of plastic credits under Verra PWR (Verra project 4722) covering 84,000 t of recycled plastic over 1 Aug 2016 - 31 Jul 2023, described as the largest plastic-credit issuance globally to date . This is a separate Verra track rather than the CDM AMS-III.AJ Banten pipeline entry, but it is the most recent public signal of H201/RePL activity in Indonesia.
When was this last updated?
This dossier was generated on 2026-04-23 by claude-agent-websearch.
RePL Recycling is a pipeline CDM project in Banten, Indonesia, developed by South Korea's H201 Co., Ltd under small-scale methodology AMS-III.AJ. H201 is best known for running the RePL plastic-credit program, which has separately registered a Verra PWR project with Inocycle covering 84,000 t of recycled plastic (Jun 2025) — reportedly the largest plastic-credit issuance globally to date.
Analyst briefing
Activities & scale The project is a CDM pipeline activity under AMS-III.AJ in Banten province. AMS-III.AJ is a small-scale methodology capped at the 60 kt CO2e/yr threshold and credits emissions avoided by diverting post-consumer plastics (HDPE, LDPE, PET, PP, PVC, plus polycarbonate after the 2025 clarification) from landfill back into secondary resin 2. Specific tonnage, facility address and commissioning date for this Banten entry are not disclosed in public H201/RePL materials reviewed.
5 more paragraphs plus 5 sources — sign in to read the full analysis.
Sign in with GoogleAI-generated from public sources on 2026-04-23 · confidence: medium · model: claude-agent-websearch · Flag inaccuracy
Integrity score
Moderate
v1 methodology, calibrating. Last computed 2026-06-10.
Registries
Issuances
Pipeline — no issuances recorded.
Retirements
—
Total retired
No retirements recorded.
Satellite alerts (last 90 days)
Total
24
High confidence
0
Nominal confidence
0
Score methodology
Score computed 2026-06-10 from inputs: alerts last 90 days (24), high-confidence alerts (0), registries (1), years since validation (unknown).
Methodology v1. Weights: validation recency 25%, reversal risk 35%, community flags 20%, transparency 20%. See full methodology →