RECOVERY AND AVOIDANCE OF METHANE FROM INDUSTRIAL WASTEWATER TREATMENT PROJECT AT TSE GROUP, INDONESIA
KNOWLEDGE INTEGRATION SERVICES SINGAPORE PTE. LTD. · Papua · — ha
POME methane recovery project at TSE Group's palm oil mills in Papua, Indonesia, under CDM AMS-III.H. Developed by Singapore-based KIS for Tunas Sawa Erma (the former Korindo palm oil arm), whose Papua concessions are the subject of long-running deforestation and Indigenous-rights controversies. First POME-to-energy plant in Papua inaugurated 1 Aug 2025 in Merauke at ~2 MW, ~60,708 tCO2e/yr.
- Name
- RECOVERY AND AVOIDANCE OF METHANE FROM INDUSTRIAL WASTEWATER TREATMENT PROJECT AT TSE GROUP, INDONESIA
- Developer
- KNOWLEDGE INTEGRATION SERVICES SINGAPORE PTE. LTD.
- Province
- Papua
- Type
- Waste handling and disposal
- Methodology
- AMS-III.H.
- Status
- Pipeline
- Integrity score
- 63 / 100
- Registry IDs
- Verra VCS4792
- Generated
- Updated 2026-04-23
What is RECOVERY AND AVOIDANCE OF METHANE FROM INDUSTRIAL WASTEWATER TREATMENT PROJECT AT TSE GROUP, INDONESIA?
POME methane recovery project at TSE Group's palm oil mills in Papua, Indonesia, under CDM AMS-III.H.
Who operates RECOVERY AND AVOIDANCE OF METHANE FROM INDUSTRIAL WASTEWATER TREATMENT PROJECT AT TSE GROUP, INDONESIA?
RECOVERY AND AVOIDANCE OF METHANE FROM INDUSTRIAL WASTEWATER TREATMENT PROJECT AT TSE GROUP, INDONESIA is developed by KNOWLEDGE INTEGRATION SERVICES SINGAPORE PTE. LTD. and listed on Verra VCS4792.
What is its integrity score?
63 / 100. Driven down by validation recency (50) and supported by community flags (75).
Why is it notable?
Latest news. On 1 August 2025 (Reuters via TradingView), TSE Group inaugurated what it calls Papua's first POME-to-energy plant, in Merauke, South Papua, with Governor Apolo Safanpo and Merauke Regent Yoseph Gebze present; CEO Robert Seung framed it as part of TSE's net-zero pathway . A March 2025 TSE corporate post described the $3.6M biogas plant nearing completion in Boven Digoel .
When was this last updated?
This dossier was generated on 2026-04-23 by claude-agent-websearch.
POME methane recovery project at TSE Group's palm oil mills in Papua, Indonesia, under CDM AMS-III.H. Developed by Singapore-based KIS for Tunas Sawa Erma (the former Korindo palm oil arm), whose Papua concessions are the subject of long-running deforestation and Indigenous-rights controversies. First POME-to-energy plant in Papua inaugurated 1 Aug 2025 in Merauke at ~2 MW, ~60,708 tCO2e/yr.
Analyst briefing
Activities & scale The project installs anaerobic digesters with methane capture at Tunas Sawa Erma palm oil mills in Papua, generating CERs by destroying/avoiding CH4 that would otherwise vent from POME ponds. TSE's own communications describe two 7,800 m3 air-tight digester tanks feeding a ~2 MW biogas-to-power plant integrated with Bio-CNG, sized to process ~1,000 m3 POME/day and abate ~60,708 tCO2e/year 1 — with plans to replicate across five more TSE subsidiary mills.
5 more paragraphs plus 4 sources — sign in to read the full analysis.
Sign in with GoogleAI-generated from public sources on 2026-04-23 · confidence: medium · model: claude-agent-websearch · Flag inaccuracy
Integrity score
Moderate
v1 methodology, calibrating. Last computed 2026-06-10.
Registries
Issuances
Pipeline — no issuances recorded.
Retirements
—
Total retired
No retirements recorded.
Satellite alerts (last 90 days)
Total
1.710
High confidence
0
Nominal confidence
0
Score methodology
Score computed 2026-06-10 from inputs: alerts last 90 days (1710), high-confidence alerts (0), registries (1), years since validation (unknown).
Methodology v1. Weights: validation recency 25%, reversal risk 35%, community flags 20%, transparency 20%. See full methodology →