Nunukan Mangrove & Peatland Project

PT. Bumi Hijau Konservasi · North Kalimantan · 15.591 ha

Pipeline

Pipeline AFOLU project on the Indonesia-Malaysia border in Nunukan Regency, North Kalimantan, stacking REDD (VM0007), tidal wetland restoration (VM0033) and ARR (VM0047) across 15,591 ha of mangrove and peat. Developer PT. Bumi Hijau Konservasi has signed a Letter of Intent with IDXCarbon. Regional conversion drivers are shrimp aquaculture, oil palm, and border-zone clearing; no issuances yet.

Name
Nunukan Mangrove & Peatland Project
Developer
PT. Bumi Hijau Konservasi
Province
North Kalimantan
Type
Agriculture Forestry and Other Land Use
Methodology
VM0007,VM0033,VM0047
Hectares
15.591 ha
Status
Pipeline
Integrity score
63 / 100
Registry IDs
Verra VCS5845
Generated
Updated 2026-04-23

What is Nunukan Mangrove & Peatland Project?

Pipeline AFOLU project on the Indonesia-Malaysia border in Nunukan Regency, North Kalimantan, stacking REDD (VM0007), tidal wetland restoration (VM0033) and ARR (VM0047) across 15,591 ha of mangrove and peat. Developer PT.

Who operates Nunukan Mangrove & Peatland Project?

Nunukan Mangrove & Peatland Project is developed by PT. Bumi Hijau Konservasi and listed on Verra VCS5845.

What is its integrity score?

63 / 100. Driven down by validation recency (50) and supported by community flags (75).

Why is it notable?

Latest news. (i) 18 Feb 2025 Indonesia-Malaysia Sebatik border MoU — direct tenure implication for the project footprint . (ii) Indonesian carbon delegation, including PT Bumi Hijau Konservasi's Nunukan project, profiled at COP30 Belem by IDXCarbon . (iii) Ongoing regional narrative in 2024-2025 press on mangrove degradation in Nunukan, shrimp-pond pressure, and Pemkab-TNI border mangrove patrols . No Mongabay or Verra-registry headline specific to this project surfaced.

When was this last updated?

This dossier was generated on 2026-04-23 by claude-agent-websearch.

Pipeline AFOLU project on the Indonesia-Malaysia border in Nunukan Regency, North Kalimantan, stacking REDD (VM0007), tidal wetland restoration (VM0033) and ARR (VM0047) across 15,591 ha of mangrove and peat. Developer PT. Bumi Hijau Konservasi has signed a Letter of Intent with IDXCarbon. Regional conversion drivers are shrimp aquaculture, oil palm, and border-zone clearing; no issuances yet.

Activities & scale The project covers 15,591 ha of combined mangrove and peatland in Nunukan Regency on the Indonesia-Malaysia border, bundling avoided planned deforestation, tidal wetland restoration, and afforestation/reforestation on degraded former pond and cleared parcels. It sits inside a broader Nunukan mangrove belt of hundreds of thousands of hectares, 75,283 ha of which have already been converted district-wide 23, and overlaps the Kayan-Sembakung delta system flagged by Wetlands International as a priority restoration landscape 4.

6 more paragraphs plus 9 sources — sign in to read the full analysis.

Sign in with Google

AI-generated from public sources on 2026-04-23 · confidence: medium · model: claude-agent-websearch · Flag inaccuracy

63/ 100

Moderate

Validation & verification50/100
Reversal risk (inverse)70/100
Community & benefit-sharing75/100
Transparency & disclosure55/100

v1 methodology, calibrating. Last computed 2026-06-10.

RegistryExternal IDStatusLast synced
VerraVCS5845pipeline08 Jun 2026· Synced 2 days ago

Pipeline — no issuances recorded.

Total retired

No retirements recorded.

Total

3.467

High confidence

0

Nominal confidence

0

View all alerts for this project →

Score computed 2026-06-10 from inputs: alerts last 90 days (3467), high-confidence alerts (0), registries (1), years since validation (unknown).

Methodology v1. Weights: validation recency 25%, reversal risk 35%, community flags 20%, transparency 20%. See full methodology →