← Projects · Verra
Monsoon Methane Avoidance from Industrial Wastewater in Indonesia Grouped Project
Monsoon Carbon Pte Ltd · Riau · — ha
Grouped methane-avoidance programme aggregating Indonesian industrial wastewater biogas plants (palm oil mill effluent and other agro-industrial streams) under CDM AMS-III.H, developed by Singapore-based Monsoon Carbon on Verra's VCS as VCS 5292. Each Project Activity Instance targets ~25,000-50,000 tCO2e/yr. Initial PAI is PT Intan Sejati Andalan Biogas Plant in Bathin Solapan, Bengkalis, Riau.
- Name
- Monsoon Methane Avoidance from Industrial Wastewater in Indonesia Grouped Project
- Developer
- Monsoon Carbon Pte Ltd
- Province
- Riau
- Type
- Waste handling and disposal
- Methodology
- AMS-III.H.
- Status
- Pipeline
- Integrity score
- 63 / 100
- Registry IDs
- Verra VCS5292
- Generated
- Updated 2026-04-23
What is Monsoon Methane Avoidance from Industrial Wastewater in Indonesia Grouped Project?
Grouped methane-avoidance programme aggregating Indonesian industrial wastewater biogas plants (palm oil mill effluent and other agro-industrial streams) under CDM AMS-III.H, developed by Singapore-based Monsoon Carbon on Verra's VCS as VCS 5292.
Who operates Monsoon Methane Avoidance from Industrial Wastewater in Indonesia Grouped Project?
Monsoon Methane Avoidance from Industrial Wastewater in Indonesia Grouped Project is developed by Monsoon Carbon Pte Ltd and listed on Verra VCS5292.
What is its integrity score?
63 / 100. Driven down by validation recency (50) and supported by community flags (75).
Why is it notable?
Issuance + Latest news. November 5, 2024: Monsoon announced the Indonesia grouped project (VCS 5292) and a target Verra registration by March 2025; first PAI expected to start operations October-November 2024 . As of this briefing no Verra registration or issuance event has been publicly confirmed on Monsoon's site, and Monsoon's homepage (content dated through March 2026) surfaces no Indonesia-specific update .
When was this last updated?
This dossier was generated on 2026-04-23 by claude-agent-websearch.
Grouped methane-avoidance programme aggregating Indonesian industrial wastewater biogas plants (palm oil mill effluent and other agro-industrial streams) under CDM AMS-III.H, developed by Singapore-based Monsoon Carbon on Verra's VCS as VCS 5292. Each Project Activity Instance targets ~25,000-50,000 tCO2e/yr. Initial PAI is PT Intan Sejati Andalan Biogas Plant in Bathin Solapan, Bengkalis, Riau.
Analyst briefing
Activities & scale The project captures and combusts methane from anaerobic treatment of industrial wastewater at Indonesian sites — principally palm oil mill effluent (POME) lagoons — by retrofitting covered anaerobic digesters with biogas recovery and combustion (often with electricity generation) 12. Monsoon states each participating biogas plant delivers 25,000-50,000 tCO2e/yr of emission reductions, with ambitions for 'several hundred thousand credits' once multiple PAIs are operational.
5 more paragraphs plus 3 sources — sign in to read the full analysis.
Sign in with GoogleAI-generated from public sources on 2026-04-23 · confidence: medium · model: claude-agent-websearch · Flag inaccuracy
Integrity score
Moderate
v1 methodology, calibrating. Last computed 2026-06-10.
Registries
Issuances
Pipeline — no issuances recorded.
Retirements
—
Total retired
No retirements recorded.
Satellite alerts (last 90 days)
Total
5.452
High confidence
0
Nominal confidence
0
Showing 5.000 of 5.452 alerts — see all in alerts inbox
Score methodology
Score computed 2026-06-10 from inputs: alerts last 90 days (5452), high-confidence alerts (0), registries (1), years since validation (unknown).
Methodology v1. Weights: validation recency 25%, reversal risk 35%, community flags 20%, transparency 20%. See full methodology →