Mobuya Mini Hydro Power Plant 3 x 1000 kW North Sulawesi, Indonesia

PT. Cipta Daya Nusantara · North Sulawesi Province · — ha

Pipeline

Mobuya Mini Hydro (3x1000 kW) is an operational 3 MW run-of-river mini hydropower plant in Bolaang Mongondow, North Sulawesi, developed by PT Cipta Daya Nusantara and connected to PLN's grid.

Name
Mobuya Mini Hydro Power Plant 3 x 1000 kW North Sulawesi, Indonesia
Developer
PT. Cipta Daya Nusantara
Province
North Sulawesi Province
Type
Energy industries (renewable/non-renewable sources)
Methodology
AMS-I.D.
Status
Pipeline
Integrity score
68 / 100
Latest vintage
2012
Registry IDs
Verra VCS238
Generated
Updated 2026-04-23

What is Mobuya Mini Hydro Power Plant 3 x 1000 kW North Sulawesi, Indonesia?

Mobuya Mini Hydro (3x1000 kW) is an operational 3 MW run-of-river mini hydropower plant in Bolaang Mongondow, North Sulawesi, developed by PT Cipta Daya Nusantara and connected to PLN's grid. Registered under CDM AMS-I.

Who operates Mobuya Mini Hydro Power Plant 3 x 1000 kW North Sulawesi, Indonesia?

Mobuya Mini Hydro Power Plant 3 x 1000 kW North Sulawesi, Indonesia is developed by PT. Cipta Daya Nusantara and listed on Verra VCS238.

What is its integrity score?

68 / 100. Driven down by registry transparency (55) and supported by community flags (75).

Why is it notable?

Latest news. No material third-party news surfaced in the last 12 months in the sources reviewed.

When was this last updated?

This dossier was generated on 2026-04-23 by claude-agent-websearch.

Mobuya Mini Hydro (3x1000 kW) is an operational 3 MW run-of-river mini hydropower plant in Bolaang Mongondow, North Sulawesi, developed by PT Cipta Daya Nusantara and connected to PLN's grid. Registered under CDM AMS-I.D. Ownership of PT CDN passed from Yance Tanesia to the AKa Sinergi Group (ASG) via a 2018 acquisition; an asset-dispute lawsuit was rejected by PN Manado in 2021.

Plant basics The Mobuya Mini Hydro Power Plant comprises 3x1000 kW turbine units (3 MW aggregate) located on the Mobuya river system in Bolaang Mongondow regency, North Sulawesi. It is a run-of-river small-scale hydro facility that exports electricity to the PLN grid, commonly referenced locally as PLTM Mobuya or PLTA Mobuya 1.

5 more paragraphs plus 4 sources — sign in to read the full analysis.

Sign in with Google

AI-generated from public sources on 2026-04-23 · confidence: medium · model: claude-agent-websearch · Flag inaccuracy

68/ 100

Moderate

Validation & verification70/100
Reversal risk (inverse)70/100
Community & benefit-sharing75/100
Transparency & disclosure55/100

v1 methodology, calibrating. Last computed 2026-06-10.

RegistryExternal IDStatusLast synced
VerraVCS238pipeline08 Jun 2026· Synced 2 days ago
VintageCredits (tCO₂e)Issuance dateSerial range
20127.0632013-03-07
201110.9172013-03-07
201010.4642013-03-07
20099.4422010-06-25
200811.9632010-06-25
20074.2122010-06-25

Total retired

No retirements recorded.

Total

2.524

High confidence

0

Nominal confidence

0

View all alerts for this project →

Score computed 2026-06-10 from inputs: alerts last 90 days (2524), high-confidence alerts (0), registries (1), years since validation (6.18).

Methodology v1. Weights: validation recency 25%, reversal risk 35%, community flags 20%, transparency 20%. See full methodology →