MedcoEnergi Associated Gas Recovery and Utilization Project

PT. Medco LPG Kaji (MLK) · South Sumatera Province · — ha

Pipeline

MedcoEnergi's Kaji associated-gas recovery project, run by PT Medco LPG Kaji (MLK) in South Sumatra, captures gas that would otherwise be flared at the Kaji-Semoga oil field and processes it into LPG, condensate and residual gas. LPG refinery began operating 2004 and sought CDM registration under methodology AM0009 via Dec 2006 host-country approval.

Name
MedcoEnergi Associated Gas Recovery and Utilization Project
Developer
PT. Medco LPG Kaji (MLK)
Province
South Sumatera Province
Type
Fugitive emissions from fuels (solid, oil and gas)
Methodology
AM0009
Status
Pipeline
Integrity score
68 / 100
Latest vintage
2009
Registry IDs
Verra VCS409
Generated
Updated 2026-04-23

What is MedcoEnergi Associated Gas Recovery and Utilization Project?

MedcoEnergi's Kaji associated-gas recovery project, run by PT Medco LPG Kaji (MLK) in South Sumatra, captures gas that would otherwise be flared at the Kaji-Semoga oil field and processes it into LPG, condensate and residual gas. LPG refinery began operating 2004 and sought CDM registration under methodology AM0009 via Dec 2006 host-country approval.

Who operates MedcoEnergi Associated Gas Recovery and Utilization Project?

MedcoEnergi Associated Gas Recovery and Utilization Project is developed by PT. Medco LPG Kaji (MLK) and listed on Verra VCS409.

What is its integrity score?

68 / 100. Driven down by registry transparency (55) and supported by community flags (75).

Why is it notable?

Latest news. No material third-party news surfaced in the last 12 months in the sources reviewed.

When was this last updated?

This dossier was generated on 2026-04-23 by claude-agent-websearch.

MedcoEnergi's Kaji associated-gas recovery project, run by PT Medco LPG Kaji (MLK) in South Sumatra, captures gas that would otherwise be flared at the Kaji-Semoga oil field and processes it into LPG, condensate and residual gas. LPG refinery began operating 2004 and sought CDM registration under methodology AM0009 via Dec 2006 host-country approval.

Activities & scale The project installed an LPG refinery alongside the Kaji-Semoga oil field ~80 km from Palembang, South Sumatra, enabling recovery and processing of associated gas into LPG, condensate and residual gas instead of flaring 3. Construction began 2003 and the refinery entered operation in 2004 under PT Medco LPG Kaji (MLK).

6 more paragraphs plus 4 sources — sign in to read the full analysis.

Sign in with Google

AI-generated from public sources on 2026-04-23 · confidence: medium · model: claude-agent-websearch · Flag inaccuracy

68/ 100

Moderate

Validation & verification70/100
Reversal risk (inverse)70/100
Community & benefit-sharing75/100
Transparency & disclosure55/100

v1 methodology, calibrating. Last computed 2026-06-10.

RegistryExternal IDStatusLast synced
VerraVCS409pipeline08 Jun 2026· Synced 2 days ago
VintageCredits (tCO₂e)Issuance dateSerial range
200970.7572011-11-28
20091.0002010-10-29
200897.3242011-11-28
20085.0002010-12-28
20085.0002010-10-29
2007105.8172011-12-12
20072.2222011-11-28
20075.0002010-12-28
200746.5192010-06-25
2006114.6642011-12-12
200639.5002010-12-29

Total retired

No retirements recorded.

Total

13.562

High confidence

0

Nominal confidence

0

View all alerts for this project →

Showing 5.000 of 13.562 alerts — see all in alerts inbox

Score computed 2026-06-10 from inputs: alerts last 90 days (13562), high-confidence alerts (0), registries (1), years since validation (6.18).

Methodology v1. Weights: validation recency 25%, reversal risk 35%, community flags 20%, transparency 20%. See full methodology →