Kapuas Pisau Conservation Project

PT. Indo Hutan Ekosistem · Central Kalimantan · 13.580 ha

Pipeline

Early-stage AFOLU project in Central Kalimantan developed by PT Indo Hutan Ekosistem, covering 13,580 ha along the Kapuas River between Kapuas and Pulang Pisau regencies.

Name
Kapuas Pisau Conservation Project
Developer
PT. Indo Hutan Ekosistem
Province
Central Kalimantan
Type
Agriculture Forestry and Other Land Use
Methodology
VM0007,VM0047
Hectares
13.580 ha
Status
Pipeline
Integrity score
63 / 100
Registry IDs
Verra VCS5736
Generated
Updated 2026-04-23

What is Kapuas Pisau Conservation Project?

Early-stage AFOLU project in Central Kalimantan developed by PT Indo Hutan Ekosistem, covering 13,580 ha along the Kapuas River between Kapuas and Pulang Pisau regencies. Stacks REDD+ (VM0007) with ARR (VM0047) on a landscape historically used by the failed Mega Rice and KFCP REDD pilot.

Who operates Kapuas Pisau Conservation Project?

Kapuas Pisau Conservation Project is developed by PT. Indo Hutan Ekosistem and listed on Verra VCS5736.

What is its integrity score?

63 / 100. Driven down by validation recency (50) and supported by community flags (75).

Why is it notable?

Latest news. No dated news coverage of the 'Kapuas Pisau Conservation Project' or PT Indo Hutan Ekosistem was found in Verra announcements, Mongabay, The Diplomat, Fastmarkets, or Pulitzer Center reporting through April 2026. Related Central Kalimantan developments in the same period include the Indonesia-Verra MRA signed 2 October 2025 and the separately identified South Barito Kapuas Project (PCP-4782) in adjoining villages .

When was this last updated?

This dossier was generated on 2026-04-23 by claude-agent-websearch.

Early-stage AFOLU project in Central Kalimantan developed by PT Indo Hutan Ekosistem, covering 13,580 ha along the Kapuas River between Kapuas and Pulang Pisau regencies. Stacks REDD+ (VM0007) with ARR (VM0047) on a landscape historically used by the failed Mega Rice and KFCP REDD pilot. No Verra registration, no issuances, and no named buyers were located as of April 2026; status remains pipeline.

Activities and scale The Kapuas Pisau Conservation Project is a 13,580 ha AFOLU project in the pipeline stage, combining avoided deforestation and peat-forest conservation under VM0007 with afforestation, reforestation, and revegetation (ARR) under VM0047 12. The footprint is small relative to the flagship Central Kalimantan peat projects (Katingan Mentaya at ~149,800 ha, Rimba Raya at roughly 64,000 ha), positioning Kapuas Pisau as a boutique methodology-stacked project rather than a jurisdictional-scale REDD+ effort 34.

6 more paragraphs plus 14 sources — sign in to read the full analysis.

Sign in with Google

AI-generated from public sources on 2026-04-23 · confidence: low · model: claude-agent-websearch · Flag inaccuracy

63/ 100

Moderate

Validation & verification50/100
Reversal risk (inverse)70/100
Community & benefit-sharing75/100
Transparency & disclosure55/100

v1 methodology, calibrating. Last computed 2026-06-10.

RegistryExternal IDStatusLast synced
VerraVCS5736pipeline08 Jun 2026· Synced 2 days ago

Pipeline — no issuances recorded.

Total retired

No retirements recorded.

Total

10.121

High confidence

0

Nominal confidence

0

View all alerts for this project →

Showing 5.000 of 10.121 alerts — see all in alerts inbox

Score computed 2026-06-10 from inputs: alerts last 90 days (10121), high-confidence alerts (0), registries (1), years since validation (unknown).

Methodology v1. Weights: validation recency 25%, reversal risk 35%, community flags 20%, transparency 20%. See full methodology →