KALTIM HUTAMA IFM PROJECT

Multiple Proponents · West Papua · 141.849 ha

Pipeline

KALTIM HUTAMA IFM is a pipeline VM0010 Improved Forest Management project over 141,849 ha, developed on a natural-forest logging concession held by PT Kaltim Hutama (Sinar Wijaya Group). Despite the 'Kaltim' name, the underlying IUPHHK-HA concession sits in Kaimana (West Papua) and Nabire (Central Papua), not East Kalimantan. No issuances or buyers have been identified.

Name
KALTIM HUTAMA IFM PROJECT
Developer
Multiple Proponents
Province
West Papua
Type
Agriculture Forestry and Other Land Use
Methodology
VM0010
Hectares
141.849 ha
Status
Pipeline
Integrity score
63 / 100
Registry IDs
Verra VCS5798
Generated
Updated 2026-04-23

What is KALTIM HUTAMA IFM PROJECT?

KALTIM HUTAMA IFM is a pipeline VM0010 Improved Forest Management project over 141,849 ha, developed on a natural-forest logging concession held by PT Kaltim Hutama (Sinar Wijaya Group). Despite the 'Kaltim' name, the underlying IUPHHK-HA concession sits in Kaimana (West Papua) and Nabire (Central Papua), not East Kalimantan.

Who operates KALTIM HUTAMA IFM PROJECT?

KALTIM HUTAMA IFM PROJECT is developed by Multiple Proponents and listed on Verra VCS5798.

What is its integrity score?

63 / 100. Driven down by validation recency (50) and supported by community flags (75).

Why is it notable?

Latest news. No material third-party news surfaced in the last 12 months in the sources reviewed.

When was this last updated?

This dossier was generated on 2026-04-23 by claude-agent-websearch.

KALTIM HUTAMA IFM is a pipeline VM0010 Improved Forest Management project over 141,849 ha, developed on a natural-forest logging concession held by PT Kaltim Hutama (Sinar Wijaya Group). Despite the 'Kaltim' name, the underlying IUPHHK-HA concession sits in Kaimana (West Papua) and Nabire (Central Papua), not East Kalimantan. No issuances or buyers have been identified.

Activities & scale The project is listed as a VM0010 Improved Forest Management initiative covering 141,849 ha, with Multiple Proponents and pipeline status. VM0010 monetises emissions avoided by reducing selective-logging intensity relative to a baseline logging plan; Verra has noted that nineteen VM0010 projects were issuing credits as of mid-2025 and the methodology was updated in 2024 1. The 141,849 ha project footprint is consistent with a 'logged-to-protected' subset of PT Kaltim Hutama's roughly 161,670 ha natural-forest concession 23.

6 more paragraphs plus 7 sources — sign in to read the full analysis.

Sign in with Google

AI-generated from public sources on 2026-04-23 · confidence: medium · model: claude-agent-websearch · Flag inaccuracy

63/ 100

Moderate

Validation & verification50/100
Reversal risk (inverse)70/100
Community & benefit-sharing75/100
Transparency & disclosure55/100

v1 methodology, calibrating. Last computed 2026-06-10.

RegistryExternal IDStatusLast synced
VerraVCS5798pipeline08 Jun 2026· Synced 2 days ago

Pipeline — no issuances recorded.

Total retired

No retirements recorded.

Total

6.824

High confidence

0

Nominal confidence

0

View all alerts for this project →

Showing 5.000 of 6.824 alerts — see all in alerts inbox

Score computed 2026-06-10 from inputs: alerts last 90 days (6824), high-confidence alerts (0), registries (1), years since validation (unknown).

Methodology v1. Weights: validation recency 25%, reversal risk 35%, community flags 20%, transparency 20%. See full methodology →