← Projects · Verra
Installation of high efficiency wood burning cookstoves in Indonesia 2
C-Quest Capital Stoves Asia Limited · Multiple provinces · — ha
Sister project to C-Quest Capital's Indonesia 1 cookstove programme, pipeline under VMR0006 — a methodology Verra withdrew from ICVCM CCP assessment. Developer filed Chapter 7 bankruptcy February 2025 and its former CEO faces $100M fraud investigation over credit over-issuance. Pipeline status and future issuance are highly uncertain.
- Name
- Installation of high efficiency wood burning cookstoves in Indonesia 2
- Developer
- C-Quest Capital Stoves Asia Limited
- Province
- Multiple provinces
- Type
- Energy demand
- Methodology
- VMR0006
- Status
- Pipeline
- Integrity score
- 63 / 100
- Registry IDs
- Verra VCS3328
- Generated
- Updated 2026-04-23
What is Installation of high efficiency wood burning cookstoves in Indonesia 2?
Sister project to C-Quest Capital's Indonesia 1 cookstove programme, pipeline under VMR0006 — a methodology Verra withdrew from ICVCM CCP assessment. Developer filed Chapter 7 bankruptcy February 2025 and its former CEO faces $100M fraud investigation over credit over-issuance.
Who operates Installation of high efficiency wood burning cookstoves in Indonesia 2?
Installation of high efficiency wood burning cookstoves in Indonesia 2 is developed by C-Quest Capital Stoves Asia Limited and listed on Verra VCS3328.
What is its integrity score?
63 / 100. Driven down by validation recency (50) and supported by community flags (75).
Why is it notable?
Latest news. 2025-02-28: C-Quest Capital files Chapter 7 bankruptcy (Carbon Pulse). 2025-03-07: ICVCM rules most cookstove credits out of CCP eligibility . 2024-06-26/27: Verra suspends 27 CQC projects; ICVCM opens investigation . No material news located specifically distinguishing 'Indonesia 2' from the wider CQC portfolio events.
When was this last updated?
This dossier was generated on 2026-04-23 by claude-agent-websearch.
Sister project to C-Quest Capital's Indonesia 1 cookstove programme, pipeline under VMR0006 — a methodology Verra withdrew from ICVCM CCP assessment. Developer filed Chapter 7 bankruptcy February 2025 and its former CEO faces $100M fraud investigation over credit over-issuance. Pipeline status and future issuance are highly uncertain.
Analyst briefing
Activities & scale The project, listed as 'Installation of high efficiency wood burning cookstoves in Indonesia 2,' is a sister programme to C-Quest Capital's Indonesia 1 cookstove scheme. Sits in the Verra pipeline under VMR0006 and would deploy high-efficiency wood-burning stoves to displace traditional three-stone fires; exact stove counts and ERs were not locatable in public sources 1.
6 more paragraphs plus 4 sources — sign in to read the full analysis.
Sign in with GoogleAI-generated from public sources on 2026-04-23 · confidence: medium · model: claude-agent-websearch · Flag inaccuracy
Integrity score
Moderate
v1 methodology, calibrating. Last computed 2026-06-10.
Registries
Issuances
Pipeline — no issuances recorded.
Retirements
—
Total retired
No retirements recorded.
Satellite alerts (last 90 days)
Total
1.145
High confidence
0
Nominal confidence
0
Score methodology
Score computed 2026-06-10 from inputs: alerts last 90 days (1145), high-confidence alerts (0), registries (1), years since validation (unknown).
Methodology v1. Weights: validation recency 25%, reversal risk 35%, community flags 20%, transparency 20%. See full methodology →