Pipeline

Hamparan is a 3 MW grid-connected biogas power plant at PT Hamparan Bumi Mas Abadi's CASSAVA STARCH mill in Lampung (not POME as source DB labels), developed by Gree Energy. Operational since Dec 2020. VCS registered (ID 3297); ~30,327 tCO2e/yr expected; 38,230 VCUs issued 2023. Supplies ~11-12 GWh/yr to PLN serving 19 villages.

Name
Hamparan biogas project
Developer
Multiple Proponents
Province
Lampung
Type
Waste handling and disposal
Methodology
AMS-I.D.,AMS-III.H.
Status
Pipeline
Integrity score
86 / 100
Registry IDs
Verra VCS3297
Generated
Updated 2026-04-23

What is Hamparan biogas project?

Hamparan is a 3 MW grid-connected biogas power plant at PT Hamparan Bumi Mas Abadi's CASSAVA STARCH mill in Lampung (not POME as source DB labels), developed by Gree Energy. Operational since Dec 2020.

Who operates Hamparan biogas project?

Hamparan biogas project is developed by Multiple Proponents and listed on Verra VCS3297.

What is its integrity score?

86 / 100. Driven down by registry transparency (55) and supported by reversal risk (satellite alerts) (100).

Why is it notable?

Latest news. No material news located post-2023; last public milestone is the 2023 VCS verification and first VCU issuance reported in 2024, plus a feasibility study on smallholder fertiliser co-products. Earlier coverage includes an RDI x DiBiCoo study tour hosted at the site in May 2022.

When was this last updated?

This dossier was generated on 2026-04-23 by claude-agent-websearch.

Hamparan is a 3 MW grid-connected biogas power plant at PT Hamparan Bumi Mas Abadi's CASSAVA STARCH mill in Lampung (not POME as source DB labels), developed by Gree Energy. Operational since Dec 2020. VCS registered (ID 3297); ~30,327 tCO2e/yr expected; 38,230 VCUs issued 2023. Supplies ~11-12 GWh/yr to PLN serving 19 villages.

Activities & scale The project installs an anaerobic wastewater treatment system and a 3 MW biogas engine at the Hamparan Bumi Mas Abadi (HBMA) cassava starch factory in Lampung, Sumatra 1. Fugitive methane from open lagoons is captured and combusted for on-site power and export to the PT PLN grid, reportedly delivering 11-12 GWh/yr to about 19 surrounding villages 2. Commercial Operation Date was 20 December 2020 3.

5 more paragraphs plus 4 sources — sign in to read the full analysis.

Sign in with Google

AI-generated from public sources on 2026-04-23 · confidence: medium-high · model: claude-agent-websearch · Flag inaccuracy

86/ 100

High quality

Validation & verification100/100
Reversal risk (inverse)100/100
Community & benefit-sharing75/100
Transparency & disclosure55/100

v1 methodology, calibrating. Last computed 2026-06-10.

RegistryExternal IDStatusLast synced
VerraVCS3297pipeline08 Jun 2026· Synced 2 days ago

Pipeline — no issuances recorded.

Total retired

No retirements recorded.

Total

0

High confidence

0

Nominal confidence

0

View all alerts for this project →

Score computed 2026-06-10 from inputs: alerts last 90 days (0), high-confidence alerts (0), registries (1), years since validation (2.97).

Methodology v1. Weights: validation recency 25%, reversal risk 35%, community flags 20%, transparency 20%. See full methodology →