82 MW Lau Renun Hydro Power Plant, North Sumatra

PT. PLN (Persero) · North Sumatra Province · — ha

Active

Lau Renun is an 82 MW run-of-river hydroelectric plant operated by PT PLN (Persero) in Dairi Regency, North Sumatra, commissioned 2005-2006 with two 41 MW Andritz turbines. Tagged to CDM ACM0002 and also listed on the Verra VCS registry (ID 300354) via South Pole.

Name
82 MW Lau Renun Hydro Power Plant, North Sumatra
Developer
PT. PLN (Persero)
Province
North Sumatra Province
Type
Energy industries (renewable/non-renewable sources)
Methodology
ACM0002
Status
Active
Integrity score
61 / 100
Latest vintage
2020
Registry IDs
Verra VCS488
Generated
Updated 2026-04-23

What is 82 MW Lau Renun Hydro Power Plant, North Sumatra?

Lau Renun is an 82 MW run-of-river hydroelectric plant operated by PT PLN (Persero) in Dairi Regency, North Sumatra, commissioned 2005-2006 with two 41 MW Andritz turbines. Tagged to CDM ACM0002 and also listed on the Verra VCS registry (ID 300354) via South Pole.

Who operates 82 MW Lau Renun Hydro Power Plant, North Sumatra?

82 MW Lau Renun Hydro Power Plant, North Sumatra is developed by PT. PLN (Persero) and listed on Verra VCS488.

What is its integrity score?

61 / 100. Driven down by validation recency (30) and supported by community flags (75).

Why is it notable?

Latest news. On 18 November 2025, AnalisaDaily reported that Dairi Regent Vickner Sinaga was urged by the Environmental Monitoring Institute to halt forest clearing in Parbuluan 6 and Sileuleu Parsaoran villages, the plant's upstream catchment, where a logging company is reportedly planning coffee cultivation . The article warns that continued deforestation threatens flow to the 2x41 MW turbines and the IDR 2.7 trillion Japan-funded asset.

When was this last updated?

This dossier was generated on 2026-04-23 by claude-agent-websearch.

Lau Renun is an 82 MW run-of-river hydroelectric plant operated by PT PLN (Persero) in Dairi Regency, North Sumatra, commissioned 2005-2006 with two 41 MW Andritz turbines. Tagged to CDM ACM0002 and also listed on the Verra VCS registry (ID 300354) via South Pole.

Plant basics Lau Renun (PLTA Renun) is an 82 MW run-of-river hydroelectric scheme in Pegagan Julu IV, Sumbul District, Dairi Regency, North Sumatra, roughly 3.5 hours from Medan 12. The plant exploits a natural 500 m head without a retaining dam, drawing water from the Lau Renun, Haporas, Bargot and Tapian Nauli rivers plus ~11 tributaries through largely underground penstocks. Configuration is 2x41 MW with Andritz Hydro turbines and 47.5 MVA generators; commissioning is reported as 2005-2006 after construction beginning in the 1990s 2.

5 more paragraphs plus 3 sources — sign in to read the full analysis.

Sign in with Google

AI-generated from public sources on 2026-04-23 · confidence: medium-high · model: claude-agent-websearch · Flag inaccuracy

61/ 100

Moderate

Validation & verification30/100
Reversal risk (inverse)70/100
Community & benefit-sharing75/100
Transparency & disclosure70/100

v1 methodology, calibrating. Last computed 2026-06-10.

RegistryExternal IDStatusLast synced
VerraVCS488active08 Jun 2026· Synced 2 days ago
VintageCredits (tCO₂e)Issuance dateSerial range
202036.2032023-08-21
20205002023-07-10
202078.0002023-06-06
202050.0002023-05-30
202020.1602023-05-12
20201.1452022-12-23
2019228.7692022-11-29
20188.0002022-11-29
2018109.4372022-10-31
2018100.8002022-10-26
2017149.4092022-10-31
20172.6682022-02-09
20171042021-12-20
20171152021-11-12
20172.1132021-08-16
20177.8242021-07-01
201712.5002021-05-19
20171.0002021-01-08
201742.2402020-12-15
201718.0002020-05-27
Page 1 of 4 · 68 issuancesNext →

Total retired

No retirements recorded.

Total

3.316

High confidence

0

Nominal confidence

0

View all alerts for this project →

Score computed 2026-06-10 from inputs: alerts last 90 days (3316), high-confidence alerts (0), registries (1), years since validation (14.47).

Methodology v1. Weights: validation recency 25%, reversal risk 35%, community flags 20%, transparency 20%. See full methodology →