55.5 MW Natural Gas Power Generation Project at Batu Aji Village, Riau Island, Indonesia, by PT Dalle Energy Batam.

PT Dalle Energy Batam · na · — ha

Pipeline

PT Dalle Energy Batam operates a 55.5 MW gas-fired IPP on Batam island (Riau Islands) inside Medco Power's portfolio. Registered with CDM as a CCGT conversion under ACM0007 (not AM0029 as source labels) from 2012; fixed 10-year crediting period expired May 2022 with no renewal. ICVCM-deprioritized as fossil gas. Any remaining credits are Kyoto-era CERs with near-zero VCM demand.

Name
55.5 MW Natural Gas Power Generation Project at Batu Aji Village, Riau Island, Indonesia, by PT Dalle Energy Batam.
Developer
PT Dalle Energy Batam
Province
na
Type
Energy industries (renewable/non-renewable sources)
Methodology
AM0029
Status
Pipeline
Integrity score
68 / 100
Registry IDs
Verra VCS243
Generated
Updated 2026-04-23

What is 55.5 MW Natural Gas Power Generation Project at Batu Aji Village, Riau Island, Indonesia, by PT Dalle Energy Batam.?

PT Dalle Energy Batam operates a 55.5 MW gas-fired IPP on Batam island (Riau Islands) inside Medco Power's portfolio.

Who operates 55.5 MW Natural Gas Power Generation Project at Batu Aji Village, Riau Island, Indonesia, by PT Dalle Energy Batam.?

55.5 MW Natural Gas Power Generation Project at Batu Aji Village, Riau Island, Indonesia, by PT Dalle Energy Batam. is developed by PT Dalle Energy Batam and listed on Verra VCS243.

What is its integrity score?

68 / 100. Driven down by registry transparency (55) and supported by community flags (75).

Why is it notable?

Latest news. No 2025-2026 press hits on PT Dalle Energy Batam specifically — it remains a low-profile IPP inside the Medco Power portfolio with no announced expansion, repowering, or carbon-credit reissuance. The CDM crediting period ended 31 May 2022 with no registered renewal. No material third-party news surfaced in the last 12 months in the sources reviewed.

When was this last updated?

This dossier was generated on 2026-04-23 by claude-agent-websearch.

PT Dalle Energy Batam operates a 55.5 MW gas-fired IPP on Batam island (Riau Islands) inside Medco Power's portfolio. Registered with CDM as a CCGT conversion under ACM0007 (not AM0029 as source labels) from 2012; fixed 10-year crediting period expired May 2022 with no renewal. ICVCM-deprioritized as fossil gas. Any remaining credits are Kyoto-era CERs with near-zero VCM demand.

Plant basics PT Dalle Energy Batam (DEB) operates a gas-fired IPP in Batu Aji sub-district on Batam Island, Riau Islands province — part of Indonesia's Kepulauan Riau, not mainland Riau 23. The registered address on Jl. Lintas Gas Negara, Kel. Tanjung Uncang, Kec. Batu Aji matches the 55.5 MW project description. The working configuration described by Medco Power is 2x27.5 MW Rolls-Royce RB211 aero-derivative gas turbines plus a 20.6 MW Kawasaki steam turbine generator, giving a combined-cycle nameplate near 75.6 MW; the 55.5 MW figure most likely reflects the simple-cycle gas-turbine stage 2. Gas-turbine commercial operation began April 2006 and combined-cycle operation in March 2010.

5 more paragraphs plus 4 sources — sign in to read the full analysis.

Sign in with Google

AI-generated from public sources on 2026-04-23 · confidence: medium-high · model: claude-agent-websearch · Flag inaccuracy

68/ 100

Moderate

Validation & verification70/100
Reversal risk (inverse)70/100
Community & benefit-sharing75/100
Transparency & disclosure55/100

v1 methodology, calibrating. Last computed 2026-06-10.

RegistryExternal IDStatusLast synced
VerraVCS243pipeline08 Jun 2026· Synced 2 days ago

Pipeline — no issuances recorded.

Total retired

No retirements recorded.

Total

2.888

High confidence

0

Nominal confidence

0

View all alerts for this project →

Score computed 2026-06-10 from inputs: alerts last 90 days (2888), high-confidence alerts (0), registries (1), years since validation (6.18).

Methodology v1. Weights: validation recency 25%, reversal risk 35%, community flags 20%, transparency 20%. See full methodology →