PLTA Musi is a real 210 MW run-of-river hydroelectric plant on the Musi River in Bengkulu, Sumatra, commissioned 2006 with 3x70 MW Andritz Francis turbines. Owned and operated by PLN (Persero), generating ~1,140 GWh/year and feeding the Sumatra grid. Tagged to CDM ACM0002 but no UNFCCC registration ID or CER issuance ledger was surfaced; CDM pathway may be dormant.
- Name
- 210 MW Musi Hydro Power Plant, Bengkulu
- Developer
- PT. PLN (Persero)
- Province
- Bengkulu
- Type
- Energy industries (renewable/non-renewable sources)
- Methodology
- ACM0002
- Status
- Active
- Integrity score
- 71 / 100
- Latest vintage
- 2020
- Registry IDs
- Verra VCS487
- Generated
- Updated 2026-04-23
What is 210 MW Musi Hydro Power Plant, Bengkulu?
PLTA Musi is a real 210 MW run-of-river hydroelectric plant on the Musi River in Bengkulu, Sumatra, commissioned 2006 with 3x70 MW Andritz Francis turbines. Owned and operated by PLN (Persero), generating ~1,140 GWh/year and feeding the Sumatra grid.
Who operates 210 MW Musi Hydro Power Plant, Bengkulu?
210 MW Musi Hydro Power Plant, Bengkulu is developed by PT. PLN (Persero) and listed on Verra VCS487.
What is its integrity score?
71 / 100. Driven down by validation recency (70) and supported by community flags (75).
Why is it notable?
Latest news. No material third-party news surfaced in the last 12 months in the sources reviewed. No 2025 or 2026-dated operational news items for PLTA Musi specifically (outages, overhauls, refurbishment, PPA changes, or CDM transition updates) were retrievable. No fresh CER issuance, VCS transition, or Article 6 authorization signal was found.
When was this last updated?
This dossier was generated on 2026-04-23 by claude-agent-websearch.
PLTA Musi is a real 210 MW run-of-river hydroelectric plant on the Musi River in Bengkulu, Sumatra, commissioned 2006 with 3x70 MW Andritz Francis turbines. Owned and operated by PLN (Persero), generating ~1,140 GWh/year and feeding the Sumatra grid. Tagged to CDM ACM0002 but no UNFCCC registration ID or CER issuance ledger was surfaced; CDM pathway may be dormant.
Analyst briefing
Plant basics PLTA Musi is a 210 MW run-of-river hydroelectric plant on the Musi River in Bengkulu Province, Sumatra, Indonesia 12. The facility consists of 3x70 MW Francis turbines supplied by Andritz Hydro with generators from Hitachi Mitsubishi Hydro, operating at a gross head of 404.4 meters and producing roughly 1,140 GWh of electricity annually 3. All three units were commissioned in 2006, with development cost reported at approximately $342 million. The plant is located in the Kepahiang/Rejang Lebong regency area of Bengkulu 1.
5 more paragraphs plus 4 sources — sign in to read the full analysis.
Sign in with GoogleAI-generated from public sources on 2026-04-23 · confidence: medium · model: claude-agent-websearch · Flag inaccuracy
Integrity score
Moderate
v1 methodology, calibrating. Last computed 2026-06-10.
Registries
Issuances
Retirements
—
Total retired
No retirements recorded.
Satellite alerts (last 90 days)
Total
4.725
High confidence
0
Nominal confidence
0
Score methodology
Score computed 2026-06-10 from inputs: alerts last 90 days (4725), high-confidence alerts (0), registries (1), years since validation (6.18).
Methodology v1. Weights: validation recency 25%, reversal risk 35%, community flags 20%, transparency 20%. See full methodology →